Peningkatan Faktor Daya Dengan Pemasangan Bank Kapasitor Untuk Penghematan Listrik Di Industri Semen

Idteknologi432
JudulPeningkatan Faktor Daya Dengan Pemasangan Bank Kapasitor Untuk Penghematan Listrik Di Industri Semen
Abstrakthat the installation of Capacitor bank at power factor in plant assessment can increase energy use up to 3 MVA, with this increasing automatically the energy can be used for other equipment. Therefore, the prediction of cost saving from electricity can raised more than 11 billion rupiahs. Even though, the installation of capacitor bank, cannot be implemented considering the high cost, but it is the main priority of the management.
Katakuncicement, Electrical, Capacitor bank
Kategori7
MediamasaJurnal Teknologi Lingkungan Edisi Khusus 1 "Hari Lingkungan Hidup 2006"
Alamatlinkhttp://www.kelair.bppt.go.id/Jtl/2006/khusus1/
PenulisTeguh Prayudi dan Wiharja